Project value β¬1.4m
6,000mΒ²secure archive storage facility.
CMDA and ESFR sprinkler systems to provide protection of archive, including In-Rack Sprinklers.
FM Global diesel driven fire pump, double walled diesel storage tank. Arranged as NFPA 20.
Hose reels in cabinets with distribution pipework system.
Below ground pump room plus chamber to house 450m3 sprinkler water tank.
100,000ft 3man-up racking and order-picker trucks.
Electrical BS 7671: 2018 installation to support all building services.
Fire detection system-BS 5839-1: 2017 including aspirated smoke detection, smoke heads, heat detection and call points.
CCTV-BSEN 50132 Grade 3 system.
Intruder-BSEN 50131 Grade 3 system.
Access ControlβIM security protocol Grade 3 system.
Perimeter security fencing with access-controlled pedestrian and vehicle gates.
Computer hardware, server, PC's, cabinet, monitors. Structured cabling.
On-site management throughout the project
100,000ft 3man-up racking and order-picker trucks.
Electrical BS 7671: 2018 installation to support all building services.
Fire detection system-BS 5839-1: 2017 including aspirated smoke detection, smoke heads, heat detection and call points.
CCTV-BSEN 50132 Grade 3 system.
Intruder-BSEN 50131 Grade 3 system.
Access ControlβIM security protocol Grade 3 system.
Perimeter security fencing with access-controlled pedestrian and vehicle gates.
Computer hardware, server, PC's, cabinet, monitors. Structured cabling.
On-site management throughout the project
The company provided the complete design, project management, procurement, cost management and site management for the whole project scope.
The site sits within a seismic zone and therefore all construction, installation and racking calculations required design within EN 1998-1 (2004): Eurocode 8.
This region was a new market for the company and procurement required finding suitable contractors and material suppliers compliant with NFPA and the client standards. Most goods are imported to Cyprus so shipping too needed to be strategically programmed. Installation of an ESFR high-hazard sprinkler system in a storage environment was additionally a country first.
The company deliver design solutions based on the cornerstone of sustainability, environmental integrity, economic viability and social well-being.
Expert fire safety solutions tailored to your project needs. Our certified fire engineers provide comprehensive assessments, innovative designs, and strategic planning to ensure compliance.
Integrated M&E solutions designed for efficiency and sustainability. We deliver advanced building services, including HVAC, lighting, and controls for optimal performance.
Complete fire protection systems that safeguard buildings and occupants. Our team designs state-of-the-art detection, suppression, and alarm systems for emergency response.
End-to-end project management, delivering on time and within budget. We coordinate all aspects of engineering projects with meticulous attention to detail and clear communication.
UK London
3rd Floor, News Building,
3 London Bridge Street,
London, SE1 9SG, UK
UK South West
Building 1000
Lakeside
North Harbour
Portsmouth PO6 3EN, UK
UK North
Warwick Mill Business Centre
Warwick Bridge
Carlisle
Cumbria, CA4 8RR, UK
New Zealand
Level 1 - 373 Dominion Rd
Mt Eden
Auckland, 1024
New Zealand
Copyright Β© 2024 Osborn Associates Ltd. Company Reg. 02935660. Website design and development by Osborn Online.