Summary Case Study:

Moor Lane Respite Centre

Royal Borough of Kingston upon Thames

  • Project Β£2.5 million

  • M&E, fire, security and public health facilities for new family respite accommodation centre.

  • Mechanical ventilation, comfort cooling and heating, domestic hot and cold-water services, soil and waste.

  • Electrical switch gear and sub-main distribution to medical equipment, low voltage power supply lighting and emergency lighting, security and fire detection systems.

  • Access control, CCTV, assisted toilet alarm system, audio entry system, TV system provision and antenna installation, structured cabling, telephone services (copper and optic fibreline).

  • Fire alarm system in accordance to BS 5839 and BS 5588 to L1 standard, smoke detectors, multi-sensors, heat detectors, manual call points.

  • Noise survey conducted in accordance with BS 4142:2014 β€˜Methods forrating and assessing industrial and commercial sound’.

  • Rainwater recovery management system.

  • Testing, commissioning and training for all installed services.

  • Access control, CCTV, assisted toilet alarm system, audio entry system, TV system provision and antenna installation, structured cabling, telephone services (copper and optic fibreline).

  • Fire alarm system in accordance to BS 5839 and BS 5588 to L1 standard, smoke detectors, multi-sensors, heat detectors, manual call points.

  • Noise survey conducted in accordance with BS 4142:2014 β€˜Methods forrating and assessing industrial and commercial sound’.

  • Rainwater recovery management system.

  • Testing, commissioning and training for all installed services.

Our Role:

The company were instructed to provide a complete building services design consultancy service for new respite accommodation at the Moor Lane Centre. This facility provides an integrated service for children with disabilities. Comprising of a single storey accommodation block with 8 bedrooms for SEND visitors, associated bathrooms, staff suite and living / dining areas.

Challenges & Collaboration:

The facility was considered a location where particular risk of fire exists: BD2-low density of occupation with difficult conditions of evacuation. It was critical therefore that all installations were made in accordance with the regulatory criteria associated with each service. The company worked closely with the Royal Borough of Kingston upon Thames’ local and building control personnel to provide a safe and effective solution.

Commitment to Sustainability and the Environment:

The company deliver design solutions based on the cornerstone of sustainability, environmental integrity, economic viability and social well-being.

Our Professional Services

πŸ”₯

Fire Engineering

Expert fire safety solutions tailored to your project needs. Our certified fire engineers provide comprehensive assessments, innovative designs, and strategic planning to ensure compliance.

πŸ”§

Mechanical & Electrical Engineering

Integrated M&E solutions designed for efficiency and sustainability. We deliver advanced building services, including HVAC, lighting, and controls for optimal performance.

🚨

Fire Protection Engineering

Complete fire protection systems that safeguard buildings and occupants. Our team designs state-of-the-art detection, suppression, and alarm systems for emergency response.

πŸ“‹

Project Management

End-to-end project management, delivering on time and within budget. We coordinate all aspects of engineering projects with meticulous attention to detail and clear communication.

Head Office

South Barn

Crockham Park

Edenbridge

Kent TN8 6SR

UK London

3rd Floor, News Building,

3 London Bridge Street,

London, SE1 9SG, UK

UK South West

Building 1000

Lakeside

North Harbour

Portsmouth PO6 3EN, UK

UK North

Warwick Mill Business Centre

Warwick Bridge

Carlisle

Cumbria, CA4 8RR, UK

New Zealand

Level 1 - 373 Dominion Rd

Mt Eden

Auckland, 1024

New Zealand

Copyright Β© 2024 Osborn Associates Ltd. Company Reg. 02935660. Website design and development by Osborn Online.