Summary Case Study:

London Olympics Park 2012

  • Fire systems concept, design and installation to the London 2012 main park

  • Sprinkler system to the main retail outlet

  • Fire fighting mains to the hockey arena

  • Review of the overall park water mains system for fire fighting purposes

  • Management of the fire systems during the games periods

The Scheme:

The scheme consisted of providing structures on the main Olympic Park during 2012 in support of the main sporting arenas which were constructed prior to this period. These facilities were essential to making the games a commercial success and looking after the welfare of the visitors from throughout the world.

Our Role:

Our role consisted of providing the detailed sprinkler system design to the megastore building and also contracting the installation works, providing construction management services under the strictest of life health safety standards. In addition we provided the firefighting watermain supplies to the hockey arena and also contracted this facility.

Challenges & Collaboration:

Our design involvement with the scheme was completed successfully during early 2012and approved under a challenging programme.

Commitment to Sustainability and the Environment:

All works were conceptualised and realised to the highest environmental and legacy standards.

Our Professional Services

🔥

Fire Engineering

Expert fire safety solutions tailored to your project needs. Our certified fire engineers provide comprehensive assessments, innovative designs, and strategic planning to ensure compliance.

🔧

Mechanical & Electrical Engineering

Integrated M&E solutions designed for efficiency and sustainability. We deliver advanced building services, including HVAC, lighting, and controls for optimal performance.

🚨

Fire Protection Engineering

Complete fire protection systems that safeguard buildings and occupants. Our team designs state-of-the-art detection, suppression, and alarm systems for emergency response.

📋

Project Management

End-to-end project management, delivering on time and within budget. We coordinate all aspects of engineering projects with meticulous attention to detail and clear communication.

Head Office

South Barn

Crockham Park

Edenbridge

Kent TN8 6SR

UK London

3rd Floor, News Building,

3 London Bridge Street,

London, SE1 9SG, UK

UK South West

Building 1000

Lakeside

North Harbour

Portsmouth PO6 3EN, UK

UK North

Warwick Mill Business Centre

Warwick Bridge

Carlisle

Cumbria, CA4 8RR, UK

New Zealand

Level 1 - 373 Dominion Rd

Mt Eden

Auckland, 1024

New Zealand

Copyright © 2024 Osborn Associates Ltd. Company Reg. 02935660. Website design and development by Osborn Online.